The minimum order for ready-mix concrete is 3 m³. For smaller quantities we look for a solution within the delivery schedule in your area; please call our order line.
We recommend ordering at least 24 hours ahead for standard pours, and 48 hours ahead for pumped pours and pours over 50 m³. Call our order line about urgent requests.
Pumping is priced separately. The right pump is chosen based on pour volume, building height and reach, and shown as a separate line in your quote.
Yes. With advance planning we pour at night and at weekends for areas with traffic restrictions and for large pours.
The concrete class is set in the structural design. Reinforced concrete structural elements must use at least C25/30 under the building code. Send us the class specified by your design engineer and our technical team will prepare a mix suited to the site conditions.
Concrete should be placed within 90 minutes of leaving the plant, and sooner in hot weather. Tell us your placing rate when ordering and we will space the mixers accordingly.
The required number of cube or cylinder samples is taken at every pour. 7 and 28-day results are reported by email and can also be shared with your building inspection firm.
Yes. We transport precast elements from our factory to your site and install them with our expert crews. Erection plans and crane planning are included.
The calculator gives an approximate volume based on the dimensions you enter and adds a 3% waste allowance. Use your structural drawings and quantity take-off for exact volumes; our technical team can help check them.